Minor variance guides for Ontario homeowners
A minor variance is permission from your municipality's Committee of Adjustment to build something that doesn't quite meet the zoning by-law, such as an addition a little closer to the lot line than the by-law allows. Every application in Ontario is judged on the same four tests in the Planning Act. The details that change from city to city are the fee, the forms, how you file and the local Official Plan.
Each guide below starts with a short, direct answer, then explains the details. Every guide shows the date its facts were last checked and links to the sources it relies on, such as the Planning Act and the City's own pages.
The guide list is generated from every live page in this folder.
Guides
-
What is the 90% setback rule in Ontario?
Since November 21, 2025, Ontario law treats a minimum setback in a zoning by-law as 90 percent of the distance the by-law sets. A by-law asking for 1.2 metres from a side lot line, for example, is read as 1.08 metres. The rule comes from section 34(1.4) of the Planning Act and Ontario Regulation 257/25. It applies only on urban residential land and not in the Greenbelt or some areas near railways and water.
- Who can apply?
-
What are the four tests for a minor variance in Ontario?
A Committee of Adjustment can approve a minor variance only if it finds that the change meets four tests from section 45(1) of Ontario's Planning Act. The variance must keep the general intent and purpose of the Official Plan, keep the general intent and purpose of the zoning by-law, be desirable for the appropriate development or use of the property, and be minor. All four must be met. Passing three is not enough.
-
How long does a minor variance take in Ontario?
Under Ontario's Planning Act, the Committee of Adjustment holds the hearing within 30 days after its secretary-treasurer receives the application, and notice goes out at least 10 days before the hearing. After the decision, there is a 20-day period in which the applicant, the Minister or certain specified persons and public bodies can appeal. With no appeal, the decision is final once that period ends. Getting your survey, drawings and zoning review ready usually takes longer than the application itself.
-
How much does a minor variance cost in Ontario?
Each City sets its own fee. In 2026, Toronto charges $2,228.98 for additions and alterations to a house with three units or less. Mississauga charges $1,361 for most low and medium density residential applications, or $794 for driveways, decks and small accessory structures. Hamilton charges $4,135, or $745 for a routine variance such as a deck, shed or porch. Plan as well for a survey, drawings and a zoning review.
-
What projects does the VarianceReady kit cover?
The VarianceReady kit is for Ontario homeowners applying for a minor variance for changes to their own house: additions, second storeys, rear extensions, decks, porches, sheds and detached garages. Version 1 is built for applications with up to 4 variances on the City's zoning notice. If your notice lists 5 or more, the kit will tell you before you pay, and you won't be charged.